Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

May 30, 2023     Drilling pushrods and torque tubes - (3.0 hours)       Category: Controls
Tonight's task was to drill the holes in more of the bellcrank pushrods and the torque tubes. This was mostly straight forward, with measuring and marking approximate hole locations using a ruler. That was followed by drilling using a V-block that I had 3d-printed from a design downloaded from Thingiverse.

What's next? The insides of these 4 tubes need to be painted with primer.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.